Cost engineering is "the engineering practice devoted to the management of project cost, involving such activities as estimating, cost control, cost forecasting, investment appraisal and risk analysis". "Cost Engineers budget, plan and monitor investment projects. They seek the optimum balance between cost, quality and time requirements." Skills and knowledge of cost engineers are similar to those of quantity surveyors. In many industries, cost engineering is synonymous with project controls. As the title "engineer" has legal requirements in many jurisdictions (i.e. Texas, Canada), the cost engineering discipline is often renamed to project controls. A cost engineer is "an engineer whose judgment and experience are utilized in the application of scientific principles and techniques to problems of estimation; cost control; business planning and management science; profitability analysis; project management; and planning and scheduling". One key objective of cost engineering is to arrive at accurate cost estimates and schedules, and to avoid cost overruns and schedule slips. Cost engineering goes beyond preparing cost estimates and schedules by helping manage resources and supporting assessment and decision-making. "The discipline of ‘cost engineering’ can be considered to encompass a wide range of cost-related aspects of engineering and programme management, but in particular cost estimating, cost analysis/cost assessment, design-to-cost, schedule analysis/planning and risk assessment." The broad array of cost engineering topics represent the intersection of the fields of project management, business management, and engineering. Most people have a limited view of what engineering encompasses. The most obvious perception is that engineering addresses technical issues, such as the physical design of a structure or system. However, beyond the physical manifestation of a design of a structure or system (for example, a building), there are other dimensions to consider such as the money, time, and other resources that were invested in the creation of the building.

À propos de ce résultat
Cette page est générée automatiquement et peut contenir des informations qui ne sont pas correctes, complètes, à jour ou pertinentes par rapport à votre recherche. Il en va de même pour toutes les autres pages de ce site. Veillez à vérifier les informations auprès des sources officielles de l'EPFL.
Cours associés (4)
MICRO-406: Products design & systems engineering
This course will cover all the aspects of product design and system engineering from learning relevant methods to the actual implementation in a hands-on practice of product development.
MGT-510: Performance Management
The objective of the course is to provide participants with the main processes and tools a company applies to evaluate the financial and non financial performance.
ME-454: Modelling and optimization of energy systems
The goal of the lecture is to present and apply techniques for the modelling and the thermo-economic optimisation of industrial process and energy systems. The lecture covers the problem statement, th
Afficher plus
Séances de cours associées (31)
Essentiels de la gestion de projet : portée, temps et coût
Couvre les aspects essentiels de la gestion de projet comme la portée, le temps et les coûts, ainsi que l'affectation des ressources, l'optimisation des calendriers et la gestion des risques.
Prise de décision financière : analyse coûts-avantages dans les projets
Couvre la prise de décision financière par l'analyse coûts-avantages dans les projets publics, en mettant l'accent sur la viabilité de l'investissement et les implications des taux d'intérêt.
Nouvelles tendances dans le béton : adjuvants et béton haute performance
Explore l'utilisation d'adjuvants dans le béton, les développements récents dans la technologie du béton et l'impact des additifs sur la performance du béton.
Afficher plus
Publications associées (34)

The development, validation and use of an interprofessional project management questionnaire in engineering education

Roland John Tormey, Marc Laperrouza

Professional skills of project planning, risk analysis, ethical design, communication, and working in interprofessional teams are now recognised as core engineering skills. Frequently, they are addressed in engineering education through team projects. Howe ...
2023

Appropriations and Uses of Travel Time

Ludy Juliana González Villamizar

Time has always been a central factor in understanding the challenges of daily mobility. For a long time, and still today, methods of economic evaluation of transport projects have monetized time savings so that they can be included in the cost–benefit ana ...
ISTE Wiley2023

Optimal Matching of Random Parts

Thomas Alois Weber

This paper examines the minimization of the cost for an expected random production output, given an assembly of finished goods from two random inputs, matched in two categories. We describe the optimal input portfolio, first using the standard normal appro ...
2022
Afficher plus
Concepts associés (4)
Construction estimating software
Construction cost estimating software is computer software designed for contractors to estimate construction costs for a specific project. A cost estimator will typically use estimating software to estimate their bid price for a project, which will ultimately become part of a resulting construction contract. Some architects, engineers, construction managers, and others may also use cost estimating software to prepare cost estimates for purposes other than bidding such as budgeting and insurance claims.
Construction management
Construction management (CM) is a professional service that uses specialized, project management techniques and software to oversee the planning, design, construction and closeout of a project. The purpose of construction management is to control the quality of a project's scope, time / delivery and cost—sometimes referred to as a project management triangle or "triple constraints." CM is compatible with all project delivery systems, including design-bid-build, design-build, CM At-Risk and Public Private Partnerships.
Gestion de projet
La gestion de projet, est l'ensemble des activités visant à organiser le bon déroulement d’un projet et à en atteindre les objectifs en temps et en heures selon les objectifs visés. Elle consiste à appliquer les méthodes, techniques, et outils de gestion spécifiques aux différentes étapes du projet, de l'évaluation de l'opportunité jusqu'à l'achèvement du projet. Cette activité porte également le nom de conduite de projet, pilotage de projet, ingénierie de projet, ou encore management de projet.
Afficher plus

Graph Chatbot

Chattez avec Graph Search

Posez n’importe quelle question sur les cours, conférences, exercices, recherches, actualités, etc. de l’EPFL ou essayez les exemples de questions ci-dessous.

AVERTISSEMENT : Le chatbot Graph n'est pas programmé pour fournir des réponses explicites ou catégoriques à vos questions. Il transforme plutôt vos questions en demandes API qui sont distribuées aux différents services informatiques officiellement administrés par l'EPFL. Son but est uniquement de collecter et de recommander des références pertinentes à des contenus que vous pouvez explorer pour vous aider à répondre à vos questions.