The dynamic lot-size model in inventory theory, is a generalization of the economic order quantity model that takes into account that demand for the product varies over time. The model was introduced by Harvey M. Wagner and Thomson M. Whitin in 1958.
We have available a forecast of product demand
dt over a relevant time horizon t=1,2,...,N (for example we might know how many widgets will be needed each week for the next 52 weeks). There is a setup cost st incurred for each order and there is an inventory holding cost it per item per period (st and it can also vary with time if desired). The problem is how many units xt to order now to minimize the sum of setup cost and inventory cost. Let us denote inventory:
The functional equation representing minimal cost policy is:
Where H() is the Heaviside step function. Wagner and Whitin proved the following four theorems:
There exists an optimal program such that Ixt=0; ∀t
There exists an optimal program such that ∀t: either xt=0 or for some k (t≤k≤N)
There exists an optimal program such that if dt* is satisfied by some xt**, t** t* it is sufficient to consider only t** ≤ j ≤ t. In particular, if t* = t**, then it is sufficient to consider programs such that xt* > 0.
Wagner and Whitin gave an algorithm for finding the optimal solution by dynamic programming. Start with t*=1:
Consider the policies of ordering at period t**, t** = 1, 2, ... , t*, and filling demands dt , t = t**, t** + 1, ... , t*, by this order
Add H(xt**)st**+itIt to the costs of acting optimally for periods 1 to t**-1 determined in the previous iteration of the algorithm
From these t* alternatives, select the minimum cost policy for periods 1 through t*
Proceed to period t*+1 (or stop if t*=N)
Because this method was perceived by some as too complex, a number of authors also developed approximate heuristics (e.
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.
This course introduces key concepts in supply chain management. It uses a combination of case studies, simulation exercises, formal lectures and group discussions to illustrate how the various concept
The economic lot scheduling problem (ELSP) is a problem in operations management and inventory theory that has been studied by many researchers for more than 50 years. The term was first used in 1958 by professor Jack D. Rogers of Berkeley, who extended the economic order quantity model to the case where there are several products to be produced on the same machine, so that one must decide both the lot size for each product and when each lot should be produced. The method illustrated by Jack D.
The newsvendor (or newsboy or single-period or salvageable) model is a mathematical model in operations management and applied economics used to determine optimal inventory levels. It is (typically) characterized by fixed prices and uncertain demand for a perishable product. If the inventory level is , each unit of demand above is lost in potential sales. This model is also known as the newsvendor problem or newsboy problem by analogy with the situation faced by a newspaper vendor who must decide how many copies of the day's paper to stock in the face of uncertain demand and knowing that unsold copies will be worthless at the end of the day.
Operations management is an area of management concerned with designing and controlling the process of production and redesigning business operations in the production of goods or services. It involves the responsibility of ensuring that business operations are efficient in terms of using as few resources as needed and effective in meeting customer requirements. It is concerned with managing an entire production or service system which is the process that converts inputs (in the forms of raw materials, labor, consumers, and energy) into outputs (in the form of goods and/or services for consumers).
This thesis addresses the problem of industrial real-time process optimization that suffers from the presence of uncertainty. Since a process model is typically used to compute the optimal operating conditions, both plant-model mismatch and process disturb ...
We consider the production/inventory problem of a manufacturer (or a retailer) under non-stationary and stochastic supply availability. Although supply availability is uncertain, the supplier would be able to predict her near future shortages and hence sup ...
To ensure all products as perfect, inspection is essential, even though it is not possible to inspect all products after producing them like some special type products as plastic joint for the water pipe. In this direction, this paper develops an inventory ...