Probabilistic risk assessment (PRA) is a systematic and comprehensive methodology to evaluate risks associated with a complex engineered technological entity (such as an airliner or a nuclear power plant) or the effects of stressors on the environment (probabilistic environmental risk assessment, or PERA).
Risk in a PRA is defined as a feasible detrimental outcome of an activity or action. In a PRA, risk is characterized by two quantities:
the magnitude (severity) of the possible adverse consequence(s), and
the likelihood (probability) of occurrence of each consequence.
Consequences are expressed numerically (e.g., the number of people potentially hurt or killed) and their likelihoods of occurrence are expressed as probabilities or frequencies (i.e., the number of occurrences or the probability of occurrence per unit time). The total risk is the expected loss: the sum of the products of the consequences multiplied by their probabilities.
The spectrum of risks across classes of events are also of concern, and are usually controlled in licensing processes – it would be of concern if rare but high consequence events were found to dominate the overall risk, particularly as these risk assessments are very sensitive to assumptions (how rare is a high consequence event?).
Probabilistic risk assessment usually answers three basic questions:
What can go wrong with the studied technological entity or stressor, or what are the initiators or initiating events (undesirable starting events) that lead to adverse consequence(s)?
What and how severe are the potential detriments, or the adverse consequences that the technological entity (or the ecological system in the case of a PERA) may be eventually subjected to as a result of the occurrence of the initiator?
How likely to occur are these undesirable consequences, or what are their probabilities or frequencies?
Two common methods of answering this last question are event tree analysis and fault tree analysis – for explanations of these, see safety engineering.
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.
In simple terms, risk is the possibility of something bad happening. Risk involves uncertainty about the effects/implications of an activity with respect to something that humans value (such as health, well-being, wealth, property or the environment), often focusing on negative, undesirable consequences. Many different definitions have been proposed. The international standard definition of risk for common understanding in different applications is "effect of uncertainty on objectives".
Fault tree analysis (FTA) is a type of failure analysis in which an undesired state of a system is examined. This analysis method is mainly used in safety engineering and reliability engineering to understand how systems can fail, to identify the best ways to reduce risk and to determine (or get a feeling for) event rates of a safety accident or a particular system level (functional) failure.
Safety engineering is an engineering discipline which assures that engineered systems provide acceptable levels of safety. It is strongly related to industrial engineering/systems engineering, and the subset system safety engineering. Safety engineering assures that a life-critical system behaves as needed, even when components fail. Analysis techniques can be split into two categories: qualitative and quantitative methods. Both approaches share the goal of finding causal dependencies between a hazard on system level and failures of individual components.
This course looks at the relationship between our environment - both professional and general - and our health. What hazards are associated with physical, chemical and biological pollutants? How can w
Le cours vise à donner les outils permettant d'appréhender de manière fondée et scientifique la question de l'analyse et de la gestion des risques technologiques et naturels, avec une attention partic
Explores the fundamentals of risk analysis in project management, emphasizing the importance of defining project goals and providing a structured approach to risk assessment.
Explores risk analysis methods, including failure modes analysis and criticality assessment, emphasizing the importance of preliminary risk analysis.
, , , ,
A digital twin of the subsurface is crucial for all performance and risks assessments of a CO2 storage activities. The goal of the project is to develop an efficient fully-coupled geomechanical simulator for CO2 storage capable to model fluid flow along cr ...
2024
,
Safety climate assessment has become a regular practice for most organisations. However, it is often limited to questionnaires, providing only qualitative information. The indicator-based approach takes precedence over decision-making, and practical risk a ...
Risk management has become an essential element in the functioning of modern society. Correct risk identification and assessment are undoubtedly crucial to improving overall safety; nevertheless, often, it is accompanied by the wrong selection of correcti ...