A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values.
A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. A cost estimator is the professional who prepares cost estimates.
There are different types of cost estimators, whose title may be preceded by a modifier, such as building estimator, or electrical estimator, or chief estimator.
Other professionals such as quantity surveyors and cost engineers may also prepare cost estimates or contribute to cost estimates. In the US, according to the Bureau of Labor Statistics, there were 185,400 cost estimators in 2010. There are around 75,000 professional quantity surveyors working in the UK.
The U.S. Government Accountability Office (GAO) defines a cost estimate as "the summation of individual cost elements, using established methods and valid data, to estimate the future costs of a program, based on what is known today". The GAO reports that "realistic cost estimating was imperative when making wise decisions in acquiring new systems." A cost estimate is often needed to support evaluations of project feasibility or funding requirements in support of planning. A cost estimate is often used to establish a budget as the cost constraint for a project or operation.
In project management, project cost management is a major functional division. Cost estimating is one of three activities performed in project cost management.
In cost engineering, cost estimation is a basic activity. A cost engineering reference book has chapters on capital investment cost estimation and operating cost estimation. The fixed capital investment provides the physical facilities. The working capital investment is a revolving fund to keep the facilities operating.
In system, product, or facility acquisition planning, a cost estimate is used to evaluate the required funding and to compare with bids or tenders.
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.
This course will cover all the aspects of product design and system engineering from learning relevant methods to the actual implementation in a hands-on practice of product development.
A glossary of terms relating to project management and consulting. Agile software development is a set of fundamental principles about how software should be developed based on an agile way of working in contrast to previous heavy-handed software development methodologies. Aggregate planning is an operational activity which does an aggregate plan for the production process, in advance of 2 to 18 months, to give an idea to management as to what quantity of materials and other resources are to be procured and when, so that the total cost of operations of the organization is kept to the minimum over that period.
Construction management (CM) is a professional service that uses specialized, project management techniques and software to oversee the planning, design, construction and closeout of a project. The purpose of construction management is to control the quality of a project's scope, time / delivery and cost—sometimes referred to as a project management triangle or "triple constraints." CM is compatible with all project delivery systems, including design-bid-build, design-build, CM At-Risk and Public Private Partnerships.
Covers the theory and applications of extreme statistics, focusing on threshold models for analyzing extremes of time series.
Covers the application of extreme value theory to point processes and the estimation of extreme events from equally-spaced time series.
Time has always been a central factor in understanding the challenges of daily mobility. For a long time, and still today, methods of economic evaluation of transport projects have monetized time savings so that they can be included in the cost–benefit ana ...
This paper examines the minimization of the cost for an expected random production output, given an assembly of finished goods from two random inputs, matched in two categories. We describe the optimal input portfolio, first using the standard normal appro ...
Universal inference enables the construction of confidence intervals and tests without regularity conditions by splitting the data into two parts and appealing to Markov's inequality. Previous investigations have shown that the cost of this generality is a ...