Summary
The base load (also baseload) is the minimum level of demand on an electrical grid over a span of time, for example, one week. This demand can be met by unvarying power plants, dispatchable generation, or by a collection of smaller intermittent energy sources, depending on which approach has the best mix of cost, availability and reliability in any particular market. The remainder of demand, varying throughout a day, is met by dispatchable generation which can be turned up or down quickly, such as load following power plants, peaking power plants, or energy storage. Power plants that do not change their power output quickly, such as large coal or nuclear plants, are generally called baseload power plants. Historically, most or all of base load demand was met with baseload power plants, whereas new capacity based around renewables often employs flexible generation. Grid operators take long and short term bids to provide electricity over various time periods and balance supply and demand continuously. The detailed adjustments are known as the unit commitment problem in electrical power production. While historically large power grids used unvarying power plants to meet the base load, there is no specific technical requirement for this to be so. The base load can equally well be met by the appropriate quantity of intermittent power sources and dispatchable generation. Unvarying power plants can be coal, nuclear, combined cycle plants, which may take several days to start up and shut down, hydroelectric, geothermal, biogas, biomass, solar thermal with storage and ocean thermal energy conversion. The desirable attribute of dispatchability applies to some gas plants, wind (through blade pitch) and hydroelectricity. Grid operators also use curtailment to shut plants out of the grid when their energy is not needed. Grid operators solicit bids to find the cheapest sources of electricity over short and long term buying periods. Nuclear and coal plants have very high fixed costs, high plant load factor but very low marginal costs.
About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.