Application lifecycle managementApplication lifecycle management (ALM) is the product lifecycle management (governance, development, and maintenance) of computer programs. It encompasses requirements management, software architecture, computer programming, software testing, software maintenance, change management, continuous integration, project management, and release management. ALM is a broader perspective than the Software Development Life Cycle (SDLC), which is limited to the phases of software development such as requirements, design, coding, testing, configuration, project management, and change management.
Windows 8Windows 8 is a major release of the Windows NT operating system developed by Microsoft. It was released to manufacturing on August 1, 2012, and was made available for download via MSDN and TechNet on August 15, 2012. Nearly three months after its initial release, Windows 8 finally made its first retail appearance on October 26, 2012. Windows 8 is the first version of Microsoft Windows with a combination of 2D and 3D effects.
Extreme programmingExtreme programming (XP) is a software development methodology intended to improve software quality and responsiveness to changing customer requirements. As a type of agile software development, it advocates frequent releases in short development cycles, intended to improve productivity and introduce checkpoints at which new customer requirements can be adopted.
Computer performanceIn computing, computer performance is the amount of useful work accomplished by a computer system. Outside of specific contexts, computer performance is estimated in terms of accuracy, efficiency and speed of executing computer program instructions. When it comes to high computer performance, one or more of the following factors might be involved: Short response time for a given piece of work. High throughput (rate of processing work). Low utilization of computing resource(s). Fast (or highly compact) data compression and decompression.
IBMThe International Business Machines Corporation (IBM), nicknamed Big Blue, is an American multinational technology corporation headquartered in Armonk, New York and is present in over 175 countries. It specializes in computer hardware, middleware, and software, and provides hosting and consulting services in areas ranging from mainframe computers to nanotechnology. IBM is the largest industrial research organization in the world, with 19 research facilities across a dozen countries, and has held the record for most annual U.
Software deploymentSoftware deployment is all of the activities that make a software system available for use. The general deployment process consists of several interrelated activities with possible transitions between them. These activities can occur on the producer side or on the consumer side or both. Because every software system is unique, the precise processes or procedures within each activity can hardly be defined. Therefore, "deployment" should be interpreted as a general process that has to be customized according to specific requirements or characteristics.
AbandonwareAbandonware is a product, typically software, ignored by its owner and manufacturer, and for which no official support is available. Within an intellectual rights contextual background, abandonware is a software (or hardware) sub-case of the general concept of orphan works. Museums and various organizations dedicated to preserving this software continue to provide legal access. The term "abandonware" is broad, and encompasses many types of old software.
Antivirus softwareAntivirus software (abbreviated to AV software), also known as anti-malware, is a computer program used to prevent, detect, and remove malware. Antivirus software was originally developed to detect and remove computer viruses, hence the name. However, with the proliferation of other malware, antivirus software started to protect against other computer threats. Some products also include protection from malicious URLs, spam, and phishing.
End-of-life productAn end-of-life product (EOL product) is a product at the end of the product lifecycle which prevents users from receiving updates, indicating that the product is at the end of its useful life (from the vendor's point of view). At this stage, a vendor stops the marketing, selling, or provisioning of parts, services, or software updates for the product. The vendor may simply intend to limit or end support for the product. In the specific case of product sales, a vendor may employ the more specific term "end-of-sale" ("EOS").
Acceptance testingIn engineering and its various subdisciplines, acceptance testing is a test conducted to determine if the requirements of a specification or contract are met. It may involve chemical tests, physical tests, or performance tests. In systems engineering, it may involve black-box testing performed on a system (for example: a piece of software, lots of manufactured mechanical parts, or batches of chemical products) prior to its delivery.