Summary
A gravel road is a type of unpaved road surfaced with gravel that has been brought to the site from a quarry or stream bed. They are common in less-developed nations, and also in the rural areas of developed nations such as Canada and the United States. In New Zealand, and other Commonwealth countries, they may be known as metal roads. They may be referred to as "dirt roads" in common speech, but that term is used more for unimproved roads with no surface material added. If well constructed and maintained, a gravel road is an all-weather road. Compared to sealed roads, which require large machinery to work and pour concrete or to lay and smooth a bitumen-based surface, gravel roads are easy and cheap to build. However, compared to dirt roads, all-weather gravel highways are quite expensive to build, as they require front loaders, dump trucks, graders, and roadrollers to provide a base course of compacted earth or other material, sometimes macadamised, covered with one or more different layers of gravel. Graders are used to "blade" the road's surface (pass frequently to mix and distribute the gravel) to produce a more extreme camber compared to a paved road to aid drainage, to produce an "A" shaped surface to the road called a "crown", as well as to construct drainage ditches and embankments in low-lying areas. Cellular confinement systems can be used to prevent the washboarding effect. Construction of a gravel road begins with the base or subgrade layer. The expected road traffic volume and the average daily truck passage must be considered during the design process as they will influence the thickness of this layer, along with the balances of gravel and fines. Geotextile fabric may be laid to improve the stability of the subgrade layer. When geotextile fabric is used, a gravel layer with a minimum thickness of 6" (15 cm) is suggested to ensure the fabric remains unexposed. Road construction guidelines suggest that the crown in the road surface begins at the center point in the road, and does not exceed a 4% gradation from the center to the edge of the roadway.
About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.