DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.
The TISO-10-kW plant, installed in 1982 in Lugano (Switzerland), is made of 288 Arco Solar modules and is the first grid-connected PV plant in Europe. In a joint publication (Part 1), we presented the results of the electrical characterization performed in ...
2019
, ,
In this work, we investigate the relationship between potential-induced degradation (PID) and the bill of material used in module manufacturing. We manufacture samples with different combination of materials, using two types of solar cells (conventional vs ...
WILEY2019
, ,
We conducted a long-term (>6500 h) in-situ PV module humidity monitoring experiment, where digital humidity sensors encapsulated in different encapsulants (EVA, TPO, POE and ionomer) were exposed to different humidity conditions in a climatic chamber. From ...
IEEE2018
, , , , , ,
Failures in the metallic interconnections are among the main degradation modes for photovoltaic modules. Fatigue accumulation due to thermomechanical stresses can result in deterioration of the solder joints or in broken ribbons. In this paper, we first qu ...
2019
, , , ,
We evaluate the effect of storage conditions of uncured encapsulant rolls and the potential consequences on photovoltaic (PV) module performance. We show the impact of residual water trapped inside laminated double glass PV modules after lamination and dur ...
ELSEVIER2023
, ,
The TISO-10-kW solar plant, connected to the grid in 1982, is the oldest installation of this kind in Europe. Its history is well documented, and the full set of modules has been tested indoors at regular intervals over the years. After 35 years of operati ...
WILEY2019
, ,
In this work we present the result of a collaboration between the Polytechnic Schools of Dakar (ESP) and Lausanne (EPFL) on the testing and monitoring of solar photovoltaic modules. The collaboration has involved the exchange of knowledge, methodologies an ...
2017
, , , , ,
We present an electrical model developed with LT SPICE that simulates the performance of a string of cells with disconnections in the electrical circuit. In a previous contribution, we quantified experimentally how the module performance is affected when o ...
IEEE2018
, ,
The TISO-10-kW plant, installed in Lugano (Switzerland) in 1982, is the first grid-connected PV plant in Europe. In a joint publication (part 1), we presented the results of the electrical characterization performed in 2017-after 35 years of operation-of t ...
WILEY2019
A fundamental challenge with solar energy is improving the reliability, and increasing the lifetime, of photovoltaic modules. Typically, photovoltaic module manufacturers guarantee 80% of the nominal power of their modules for 25 years, but this type of gu ...