Are you an EPFL student looking for a semester project?
Work with us on data science and visualisation projects, and deploy your project as an app on top of Graph Search.
Current reconstruction in cable-in-conduit conductors (CICC) cables is a crucial issue to determine cables performance in working conditions, and must be performed using inverse problem approaches as direct measurement is not feasible. The current distribution has been studied for the ITER Poloidal Field Insert Sample (PFIS) conductor using annular arrays of Hall probes placed in three different locations along the sample during the test campaign at the SULTAN facility. The measurement apparatus is also described in the paper, together with the approach to current reconstruction. (c) 2005 Elsevier B.V. All rights reserved.
Pierluigi Bruzzone, Kamil Sedlák, Mithlesh Kumar
, ,