Are you an EPFL student looking for a semester project?
Work with us on data science and visualisation projects, and deploy your project as an app on top of Graph Search.
This paper focuses on the scheduling problem of minimizing makespan for a given set of jobs in a two-stage hybrid flowshop subject to a product-mix ratio constraint. There are identical parallel machines at the first stage of the hybrid flowshop, while there is a single batch-processing machine at the second stage. Ready times of the jobs (at the first stage) may be different, and a given product-mix ratio of job types should be kept in each batch at the second stage. We present three types of heuristic algorithms: forward scheduling algorithms, backward scheduling algorithms, and iterative algorithms. To evaluate performance of the suggested algorithms, a series of computational experiments are performed on randomly generated test problems and results are reported.
Corentin Jean Dominique Fivet, Tao Sun
,