Publication

The performance test and analysis of the third and fourth China PF conductor for ITER

Related publications (32)

Long plasma duration operation analyses with an international multi-machine (tokamaks and stellarators) database

Stefano Coda, Jeffrey Huang

Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purp ...
Bristol2024

Tests and Qualification of the European 1 MW, 170 GHz CW Gyrotron in an ITER relevant configuration at SPC

Timothy Goodman, Stefano Alberti, Jean-Philippe Hogge, Jérémy Genoud, Francisco Sanchez, Konstantinos Avramidis

After an initial testing period at the Karlsruhe Institute of Technology, the upgraded EU 1 MW, 170 GHz continuous wave (CW) industrial prototype gyrotron (TH1509U) for Electron Cyclotron Resonance Heating and Current Drive (ECRH&CD) in ITER has been trans ...
IEEE2022

Impact of mechanical and thermal cycles at different operating conditions on the ITER toroidal field coil conductor performance

Pierluigi Bruzzone, Kamil Sedlák

The impact of electromagnetic (EM) and thermal cyclic loading (referred as warm-up-cool-down-WUCD) on the Nb3Sn cable in conduit conductors for the toroidal field magnets of the ITER tokamak should be carefully assessed for the proper operation of the mach ...
IOP PUBLISHING LTD2021

Overview of Performance Test of Korean CICCs for ITER TF Magnet

Pierluigi Bruzzone, Boris Stepanov

The Korean Domestic Agency (KODA) for the International Thermonuclear Experimental Reactor (ITER) project has taken the responsibility of the procurement of cable-in-conduit conductors for the ITER toroidal field magnet. While procuring 27 conductor unit l ...
Ieee-Inst Electrical Electronics Engineers Inc2016

A combined radial collimator and cooled beryllium filter for neutron scattering

Henrik Moodysson Rønnow, Felix Groitl

A flexible, combined, radial collimator and beryllium (Be) filter have been designed and manufactured at the Paul Scherrer Institut (PSI), Switzerland. The Be is integrated in the radial collimator by placing thin Be slices between the collimator lamellas. ...
Elsevier2016

Performance of ITER Correction Busbar Conductor Samples CBCN2 and CBCN3

Pierluigi Bruzzone, Kamil Sedlák, Boris Stepanov, Fang Liu, Bo Liu

The correction busbar (CB) conductors for the ITER project are being produced in China. The second China CB conductor sample (CBCN2, Phase II of conductor testing) and the third CB conductor sample (CBCN3, Phase III testing) were made of the WST NbTi stran ...
Ieee-Inst Electrical Electronics Engineers Inc2016

Status and Experimental Results of the European 1 MW, 170 GHz Industrial CW Prototype Gyrotron for ITER

Stefano Alberti, Minh Quang Tran, Jean-Philippe Hogge, Christian Schlatter, Ioannis Pagonakis, Konstantinos Avramidis

In the frame of a collaborative effort between the European GYrotron Consortium (EGYC), the European domestic agency Fusion for Energy (F4E) and the Industrial partner Thales Electron Devices (TED), the first continuous wave (CW) prototype of the EU gyrotr ...
Ieee2016

Performance Analysis of Mass-Produced Nb3Sn Conductor for Central Solenoid in ITER

Pierluigi Bruzzone, Kamil Sedlák, Boris Stepanov

The performance of two mass-produced Nb3Sn conductors for the ITER central solenoids was tested for the first timmass-produced Nb3Sn conductorse. One was cut from the forward end of an 80-m-long conductor, and the other was cut from the forward end of a 91 ...
2016

Novel aspects of plasma control in ITER

Olivier Sauter, Federico Alberto Alfredo Felici, Jonathan Bryan Lister, Sun Hee Kim

ITER plasma control design solutions and performance requirements are strongly driven by its nuclear mission, aggressive commissioning constraints, and limited number of operational discharges. In addition, high plasma energy content, heat fluxes, neutron ...
Amer Inst Physics2015

Summary of the Test Results of ITER Conductors in SULTAN

Pierluigi Bruzzone, Kamil Sedlák, Boris Stepanov

Abstract. After completing the qualification tests of the ITER cable-in-conduit conductors (CICC), the tests of samples from the series manufacture are running in the SULTAN test facility in Villigen, Switzerland. The key test for the conductor samples is ...
2014

Graph Chatbot

Chat with Graph Search

Ask any question about EPFL courses, lectures, exercises, research, news, etc. or try the example questions below.

DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.