Publication

Influence of Operational Timing on the Efficiency of Venting Turbidity Currents

Abstract

Reservoir sedimentation is gaining growing attention as dams are aging, due to economic and environmental consequences. Venting of turbidity currents is one of many sediment management techniques, highly recommended when water is in shortage. The venting operation is experimentally investigated using two reservoir bed slopes. The main research questions concern the opening timing of bottom outlets and the duration of venting. The timings tested are relative to the arrival of the current at the outlet. The results showed that in-time venting, synchronized with the arrival of the turbidity current at the outlet, is more efficient than early or late venting. It is recommended to start opening the gates when the turbidity current is around 300 m upstream of the outlet, so that the evacuation is synchronized with the arrival of the current at the dam. Additionally, venting should not be stopped immediately after the end of the turbidity current flow but should instead last for a certain time in order to evacuate the muddy lake depending on the outflow discharge.

About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.