Publication
A Test Facility (TF) has been designed and installed at SPC to allow for the commissioning of the EU gyrotrons developed in view of their integration to the ITER EC system. The first phase of operation of this TF was dedicated to the development of the EU 2 MW coaxial cavity gyrotron [1,2].
Olivier Sauter, Bernhard Sieglin, Leonardo Pigatto