Réhabilitation de la capacité d’évacuation des crues – intégration de "PK-Weirs" sur des barrages existants
Graph Chatbot
Chattez avec Graph Search
Posez n’importe quelle question sur les cours, conférences, exercices, recherches, actualités, etc. de l’EPFL ou essayez les exemples de questions ci-dessous.
AVERTISSEMENT : Le chatbot Graph n'est pas programmé pour fournir des réponses explicites ou catégoriques à vos questions. Il transforme plutôt vos questions en demandes API qui sont distribuées aux différents services informatiques officiellement administrés par l'EPFL. Son but est uniquement de collecter et de recommander des références pertinentes à des contenus que vous pouvez explorer pour vous aider à répondre à vos questions.
During the last decades, the Upper Rhone River basin has been hit by several flood events causing significant damages in excess of 500 million Swiss Francs. From this situation, the 3rd Rhône river training project was planned in order to improve the flood ...
The use of existing hydroelectricity multi-reservoir systems for flood protection may be an efficient approach in many catchment areas. The assessment of the protection potential offered by the hydropower plants during floods requires a comprehensive analy ...
Free crest spillways are hydraulically efficient and safe in operation. Since their discharge capacity is directly proportional to the crest length several types have been developed with the purpose to increase the length of the latter. Among these types t ...
The Three-Georges Dam holds many records in the history of engineering. While the dam has produced benefits in terms of flood control, hydropower generation and increased navigation capacity of the Yangtze River, serious questions have been raised concerni ...
With increasing of hydrological data records and the development of technologies for flood discharge estimation, as well as higher requirements on dam safety issues, a large number of existing dams require spillway rehabilitation to improve their hydraulic ...
Flood management is more than ever an issue for dam designers and engineering consulting firms in charge of rehabilitation works. Piano Key Weirs are a new cost-effective type of spillway designed to improve dams discharge capacity. These structures are pa ...
Flood protection often calls on to the realization of retention works for bed load as well as wood and debris flow. Certain relatively recent arrangements did not perform according to their intended function, what shows the complexity of the design and the ...
The simulation of run-off in Alpine catchment areas is essential for the optimal operation of high head storage hydropower plants (HPPs) under normal flow conditions, but also in case of flood events. A conceptual semidistributed numerical approach is pres ...
The simulation of runoff in Alpine catchment areas is essential for the optimal operation of high-head storage hydropower plants (HPP) under normal flow conditions, but also in case of flood events. A semi-distributed conceptual numerical approach has been ...
Flood protection and river engineering projects nowadays have to improve also the ecological condition of the river. Very often the space is not available for a full restoration of the river morphology. Therefore the hydro-morphological heterogeneity has t ...