Optimization of the flood protection effect of a hydropower multi-reservoir system
Publications associées (40)
Graph Chatbot
Chattez avec Graph Search
Posez n’importe quelle question sur les cours, conférences, exercices, recherches, actualités, etc. de l’EPFL ou essayez les exemples de questions ci-dessous.
AVERTISSEMENT : Le chatbot Graph n'est pas programmé pour fournir des réponses explicites ou catégoriques à vos questions. Il transforme plutôt vos questions en demandes API qui sont distribuées aux différents services informatiques officiellement administrés par l'EPFL. Son but est uniquement de collecter et de recommander des références pertinentes à des contenus que vous pouvez explorer pour vous aider à répondre à vos questions.
Floods are not only due to fatality. It is the responsibility of the human being to protect himself from heavy damages due to natural elements, and he sometimes has the chance to profit from a given situation to influence events. One of these possibilities ...
The main goal of the 3(rd) Rhone Correction project is to improve the flood protection in the Upper Rhone River basin. In this context, the MINERVE project aims contributing to a better flow control during flood events, taking advantage from the multireser ...
Repeated failures as well as difficulties related to the implementation of new hydroelectric powerplants in industrialized countries illustrate the paradigm evolution which manages relationship between human society and nature. Problems resulting from thes ...
Streambank erosion is an aspect of flood hazards that has been largely neglected to date due to its complexity. The INTERREG IIIb NWE project « Strategies and Actions for Flood Risk Management » (SAFER) has recognized its importance by including this aspec ...
It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in wate ...
In the framework of the INTERREG IIIb NWE project « Strategies and Actions for Flood Risk Management » (SAFER), a regional streambank erosion hazard model has been developed. This diagnostic model is tested on the Lauter River in Germany. Shear stress maps ...
In the framework of the INTERREG IIIb NWE project « Strategies and Actions for Flood Risk Management » (SAFER), a detailed streambank erosion hazard model applicable to long river reaches has been developed. Streambank erosion has caused significant damage ...
La réhabilitation des barrages existants impose généralement une augmentation de leur capacité d’évacuation en crue. Dans de nombreuses situations, le PK-Weir (Piano Key Weir) offre à cet égard une solution compacte et efficace. La conception et la réalisa ...
The sustainable use of reservoirs for irrigation, flood protection, water supply and hydropower may be endangered due to unavoidable reservoir sedimentation. Turbidity currents are the main process for the transport and deposit of sediments in reservoirs, ...
In many countries dams are found to have insufficient flood discharge capacity with respect to updated design floods. Upgradig of spillway discharge capacity has therefore become a significant issue for operators of hydropower plants. The Gloriettes concre ...