Êtes-vous un étudiant de l'EPFL à la recherche d'un projet de semestre?
Travaillez avec nous sur des projets en science des données et en visualisation, et déployez votre projet sous forme d'application sur Graph Search.
Tensegrity structures are spatial self-stressed pin jointed structures where compression components (struts) are surrounded by tension elements. This paper describes a near full-scale deployable tensegrity footbridge that deploys from both sides and connects at mid-span. Two topologies that differ in terms of symmetry of elements and paths of continuous cables are compared. Although both topologies behave similarly with respect to serviceability criteria, there is a significant difference in behavior during deployment. A two-stage control methodology for the connection of both halves of the footbridge is presented. The control methodology determines active cable length changes based on computational control and measurement of the response of the structure during deployment. Both halves are successfully connected at the end of deployment. (C) 2016 Elsevier Ltd. All rights reserved.
Gilles Fourestey, Félix Schmidt
Touradj Ebrahimi, Michela Testolina, Davi Nachtigall Lazzarotto