Êtes-vous un étudiant de l'EPFL à la recherche d'un projet de semestre?
Travaillez avec nous sur des projets en science des données et en visualisation, et déployez votre projet sous forme d'application sur Graph Search.
The Rhône River, second largest in Switzerland, has already been corrected twice (1863-1893; 1930-1960) to ensure safety and economic development in the Rhône valley. However, in October 2000, the highest flood of the century occurred showing the limitations of the two first corrections and the need for a third one. The Rhône bend, located near the city of Martigny, is a priority project because of the high damage potential. Given the complexity of the hydraulic and morphological phenomena, physical and numerical modelling are used to validate and optimize the project design. To obtain the best results, the two models must be used together and the results cross-compared. Hence, they are checked and adjusted in parallel. The first tests, which were purely hydraulic, showed a good agreement between them. The extreme flood succeeded to pass through the enlarged cross-section with an acceptable water level. After these encouraging results, the morphodynamic tests are ongoing.
Mario Paolone, Elena Vagnoni, Aldo Leonardo Alerci
Charlotte Grossiord, Christoph Bachofen, Eugénie Isabelle Mas, Hervé Cochard, Alice Jacqueline Frédérique Gauthey, Alex Tunas Corzon