Are you an EPFL student looking for a semester project?
Work with us on data science and visualisation projects, and deploy your project as an app on top of Graph Search.
We consider the problem of finding the optimal time to switch between two measurable cash-flow streams. A complete characterization of the set of solutions is obtained in terms of adjoint variables which measure the available gain from deviations. An iterative procedure for the computation of the adjoint variables is provided. The results are generalized to multiple switching times, multiple cash-flow streams, switching costs, as well as switch-triggered cash-flow streams that arise in equipment-replacement problems.