Summary
The Tevatron was a circular particle accelerator (active until 2011) in the United States, at the Fermi National Accelerator Laboratory (also known as Fermilab), east of Batavia, Illinois, and is the second highest energy particle collider ever built, after the Large Hadron Collider (LHC) of the European Organization for Nuclear Research (CERN) near Geneva, Switzerland. The Tevatron was a synchrotron that accelerated protons and antiprotons in a ring to energies of up to 1 TeV, hence its name. The Tevatron was completed in 1983 at a cost of $120 million and significant upgrade investments were made during its active years of 1983–2011. The main achievement of the Tevatron was the discovery in 1995 of the top quark—the last fundamental fermion predicted by the Standard Model of particle physics. On July 2, 2012, scientists of the CDF and DØ collider experiment teams at Fermilab announced the findings from the analysis of around 500 trillion collisions produced from the Tevatron collider since 2001, and found that the existence of the suspected Higgs boson was highly likely with a confidence of 99.8%, later improved to over 99.9%. The Tevatron ceased operations on 30 September 2011, due to budget cuts and because of the completion of the LHC, which began operations in early 2010 and is far more powerful (planned energies were two 7 TeV beams at the LHC compared to 1 TeV at the Tevatron). The main ring of the Tevatron will probably be reused in future experiments, and its components may be transferred to other particle accelerators. December 1, 1968, saw the breaking of ground for the linear accelerator (linac). The construction of the Main Accelerator Enclosure began on October 3, 1969, when the first shovel of earth was turned by Robert R. Wilson, NAL's director. This would become the 6.3 km circumference Fermilab's Main Ring. The linac first 200 MeV beam started on December 1, 1970. The booster first 8 GeV beam was produced on May 20, 1971.
About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.