DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.
In the framework of a research project studying the influences of pumping/turbine modes on turbulence, flow fields and suspended sediments in reservoirs, prototype measurements are carried out at the Grimsel II pumped storage plant (Switzerland). In situ r ...
High-head storage hydropower plants operate their turbines during periods of high energy demand. The starting and stopping of turbines results in rapid fluctuations of discharge and water levels in rivers called hydropeaking, which are unfavorable from an ...
As several of other run-of:river hydropower plants, the hydraulic scheme of Lavey on the Rhone River in Switzerland is concerned by continuous reservoir sedimentation. To determine the flood evacuation capacity of the weir as well as the flow distribution ...
The complex three-dimensional unsteady flow developing in the draft tube of a Francis turbine is responsible for pressure fluctuations, which could prevent the whole hydropower plant from operating safely. Indeed, the Francis draft tube is subjected to inl ...
A semi-distributed hydrological model was developed for the upper Rhone River basin in Switzerland to provide 72 h lead time discharge forecasts for the optimization of a multireservoir system during floods The performance of the model is presented and cor ...
The main goal of the 3rd Rhône Correction project in Switzerland is to improve the flood protection in the Upper Rhone River basin. In this framework, the MINERVE project contributes to the flow control during flood events by preventive turbine and bottom ...
In recent decades, many perialpine lakes have been affected by oligotrophication due to efficient sewage treatment and by altered water turbidity due to upstream hydropower operations. Such simultaneous environmental changes often lead to public debate on ...
During the past century, the construction of hydropower dams in the watershed of Lake Brienz has significantly altered the dynamics of turbidity, which has important implications for lake productivity. To assess these effects, we measured in situ carbon as ...
High-head storage hydropower plants operate their turbines during periods of high energy demand. The starting and stopping of turbines results in rapid fluctuations of discharge and water levels in rivers called hydropeaking, which are unfavourable from an ...
The paper aims to contribute towards further shaping of the institutional framework in Switzerland in order to facilitate the development of small hydropower (