Approximation algorithmIn computer science and operations research, approximation algorithms are efficient algorithms that find approximate solutions to optimization problems (in particular NP-hard problems) with provable guarantees on the distance of the returned solution to the optimal one. Approximation algorithms naturally arise in the field of theoretical computer science as a consequence of the widely believed P ≠ NP conjecture. Under this conjecture, a wide class of optimization problems cannot be solved exactly in polynomial time.
Maximum a posteriori estimationIn Bayesian statistics, a maximum a posteriori probability (MAP) estimate is an estimate of an unknown quantity, that equals the mode of the posterior distribution. The MAP can be used to obtain a point estimate of an unobserved quantity on the basis of empirical data. It is closely related to the method of maximum likelihood (ML) estimation, but employs an augmented optimization objective which incorporates a prior distribution (that quantifies the additional information available through prior knowledge of a related event) over the quantity one wants to estimate.
Average fixed costIn economics, average fixed cost (AFC) is the fixed costs of production (FC) divided by the quantity (Q) of output produced. Fixed costs are those costs that must be incurred in fixed quantity regardless of the level of output produced. Average fixed cost is the fixed cost per unit of output. As the total number of units of the good produced increases, the average fixed cost decreases because the same amount of fixed costs is being spread over a larger number of units of output.
Average variable costIn economics, average variable cost (AVC) is a firm's variable costs (labour, electricity, etc.) divided by the quantity of output produced. Variable costs are those costs which vary with the output level: where = variable cost, = average variable cost, and = quantity of output produced. Average variable cost plus average fixed cost equals average total cost: A firm would choose to shut down if the price of its output is below average variable cost at the profit-maximizing level of output (or, more generally if it sells at multiple prices, its average revenue is less than AVC).