Front-End Engineering (FEE), or Front-End Engineering Design (FEED), is an engineering design approach used to control project expenses and thoroughly plan a project before a fix bid quote is submitted. It may also be referred to as Pre-project planning (PPP), front-end loading (FEL), feasibility analysis, or early project planning. The FEED is basic engineering, which comes after the Conceptual design or Feasibility study. The FEE design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into separate packages covering different portions of the project. The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis. A good FEED will reflect all of the client's project-specific requirements and avoid significant changes during the execution phase. FEED contracts usually take around 1 year to complete for larger-sized projects. During the FEED phase, there is close communication between Project Owners and Operators and the Engineering Contractor to work up the project-specific requirements. Front-End Engineering focuses on technical requirements and identifying main costs for a proposed project. It is used to establish a price for the execution phase of the project and evaluate potential risks. It is typically followed by Detailed Design (or Detailed Engineering). The amount of time invested in Front-End Engineering is higher than a traditional quote, because project specifications are thoroughly extracted, and the following typically developed in detail: Project Organization Chart Project Scope Defined civil, mechanical and chemical engineering HAZOP, safety and ergonomic studies 2D & 3D preliminary models Equipment layout and installation plan Engineering design package development Major equipment list Automation strategy PFD – Process Flow Diagrams and P&ID – Piping and Instrumentation Diagram Project timeline Fixed-bid quote Traditionally, all of these documents would be developed in detail during a design review after a quote has been agreed to.
À propos de ce résultat
Cette page est générée automatiquement et peut contenir des informations qui ne sont pas correctes, complètes, à jour ou pertinentes par rapport à votre recherche. Il en va de même pour toutes les autres pages de ce site. Veillez à vérifier les informations auprès des sources officielles de l'EPFL.