Scheduling is the process of arranging, controlling and optimizing work and workloads in a production process or manufacturing process. Scheduling is used to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials.
It is an important tool for manufacturing and engineering, where it can have a major impact on the productivity of a process. In manufacturing, the purpose of scheduling is to keep due dates of customers and then minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation, utilize maximum resources available and reduce costs.
In some situations, scheduling can involve random attributes, such as random processing times, random due dates, random weights, and stochastic machine breakdowns. In this case, the scheduling problems are referred to as "stochastic scheduling".
Scheduling is the process of arranging, controlling and optimizing work and workloads in a production process. Companies use backward and forward scheduling to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials.
Forward scheduling is planning the tasks from the date resources become available to determine the shipping date or the due date.
Backward scheduling is planning the tasks from the due date or required-by date to determine the start date and/or any changes in capacity required.
The benefits of production scheduling include:
Process change-over reduction
Inventory reduction, levelling
Reduced scheduling effort
Increased production efficiency
Labour load levelling
Accurate delivery date quotes
Real time information
Accurately measure utilized man/equipment hours
Production scheduling tools greatly outperform older manual scheduling methods.
Cette page est générée automatiquement et peut contenir des informations qui ne sont pas correctes, complètes, à jour ou pertinentes par rapport à votre recherche. Il en va de même pour toutes les autres pages de ce site. Veillez à vérifier les informations auprès des sources officielles de l'EPFL.
Production management deals with producing goods sustainably at the right time, quantity, and quality with the minimum cost. This course equips students with practical skills and tools for effectively
Ce cours a pour objectif de présenter la fonction logistique de l'entreprise dans le cadre d'une approche globale, de la logistique au supply chain management, en insistant sur l'importance de la dema
A schedule or a timetable, as a basic time-management tool, consists of a list of times at which possible tasks, events, or actions are intended to take place, or of a sequence of events in the chronological order in which such things are intended to take place. The process of creating a schedule — deciding how to order these tasks and how to commit resources between the variety of possible tasks — is called scheduling, and a person responsible for making a particular schedule may be called a scheduler.
L'optimisation est une branche des mathématiques cherchant à modéliser, à analyser et à résoudre analytiquement ou numériquement les problèmes qui consistent à minimiser ou maximiser une fonction sur un ensemble. L’optimisation joue un rôle important en recherche opérationnelle (domaine à la frontière entre l'informatique, les mathématiques et l'économie), dans les mathématiques appliquées (fondamentales pour l'industrie et l'ingénierie), en analyse et en analyse numérique, en statistique pour l’estimation du maximum de vraisemblance d’une distribution, pour la recherche de stratégies dans le cadre de la théorie des jeux, ou encore en théorie du contrôle et de la commande.
Couvre les méthodologies de gestion de projet, le calcul du réseau, l'allocation des ressources et le contrôle-surveillance dans la planification et la planification du projet.
Explore les complexités de la programmation dans les cadres informatiques distribués, en mettant l'accent sur l'optimisation de la localisation des données et les stratégies de multitenance.
Discute des solutions pour l'alignement des activités et des technologies de l'information et de l'importance de mettre les activités à jour en fonction des modèles de TI.
Activity-based models offer the potential for a far deeper understanding of daily mobility behaviour than trip-based models. Based on the fundamental assumption that travel demand is derived from the need to do activities, they are flexible tools that aim ...
EPFL2024
, ,
Various interactions, time arrangements, and constraints exist for individuals scheduling their day as a member of a household, which affect their in-home as well as out-of-home activity schedule. However, the existing activity-based models are mostly base ...
2023
, ,
Various interactions, time arrangements, and constraints exist for individuals scheduling their day as a member of a household, which affect their in-home as well as out-of-home activity schedule. However, the existing activity-based models are mostly base ...