This two-part article reports on the renewal and adaptation of the fixed railway track in the heavily frequented underground train station at Zurich Airport. The fixed track built in 1980 had reached the service duration predicted by the system provider an ...
The geometry of the railway track is degraded under traffic load, and must be maintained periodically. This degradation is due to the arrangement of ballast particles under loads and vibrations, which results into irreversible plastic settlements. Tamping ...
To operate the railway system safely and efficiently, a multitude of assets need to me monitored. Railway sleepers are one of these infrastructure assets, that are safety critical. To automate the monitoring process, data-driven fault diagnostics models ha ...
Due to the accumulation of traffic, the railway components are affected by the induced stresses. As a result, the geometry of the railways is degraded over time. The degradation occurs either through the partial loss of the track's geometry or through the ...
Research on friction welded wood-to-wood connections has shown high potential for further development regarding the industrial application of timber construction. This paper addresses the question to which extent welding of wood can be applied to fabricati ...