Êtes-vous un étudiant de l'EPFL à la recherche d'un projet de semestre?
Travaillez avec nous sur des projets en science des données et en visualisation, et déployez votre projet sous forme d'application sur Graph Search.
The Hongrin north dam is a 125 m-high double curvature concrete arch structure located in the western Swiss Prealps. A hydrogeological study and ground water monitoring revealed the presence of water pressure caused by slight seepage flow through the rock joints in the dam foundation, and this raised a concern about the stability of the right bank abutment. The stability of the abutment was assessed using continuum-discontiniuum analysis. The results of the analysis provide an enhanced understanding of potential failure mechanisms and help in the developement of furthur saftely measures.
Anton Schleiss, António Heleno Cardoso
Azad Koliji, Jian Zhao, Thierry Bussard
Anton Schleiss, António Heleno Cardoso