Analysis of TBM tunnelling performance in faulted and highly fractured rocks
Publications associées (54)
Graph Chatbot
Chattez avec Graph Search
Posez n’importe quelle question sur les cours, conférences, exercices, recherches, actualités, etc. de l’EPFL ou essayez les exemples de questions ci-dessous.
AVERTISSEMENT : Le chatbot Graph n'est pas programmé pour fournir des réponses explicites ou catégoriques à vos questions. Il transforme plutôt vos questions en demandes API qui sont distribuées aux différents services informatiques officiellement administrés par l'EPFL. Son but est uniquement de collecter et de recommander des références pertinentes à des contenus que vous pouvez explorer pour vous aider à répondre à vos questions.
Two of four headrace tunnels in the Jinping II hydropower project were constructed using tunnel boring machines (TMBs). The geology along the tunnel alignment is dominantly massive to highly fractured marble and the maximum overburden depth is 2,525 m. The ...
The Online Chemical Modeling Environment is a web-based platform that aims to automate and simplify the typical steps required for QSAR modeling. The platform consists of two major subsystems: the database of experimental measurements and the modeling fram ...
As data collections become larger and larger, users are faced with increasing bottlenecks in their data analysis. More data means more time to prepare the data, to load the data into the database and to execute the desired queries. Many applications alread ...
Saturated critical heat flux (CHF) is an important issue during flow boiling in mini and microchannels. To determine the best prediction method available in the literature, 2996 data points from 19 different laboratories have been collected since 1958. The ...
A coupled hydro-mechanical formulation is presented for the analysis of landslide motion during crisis episodes. The mathematical formulation is used to model a natural slope affected by a multiple slip surface failure mechanism, in which pore water pressu ...
As data collections become larger and larger, data loading evolves to a major bottleneck. Many applications already avoid using database systems, e.g., scientific data analysis and social networks, due to the complexity and the increased data-to-query time ...
Within the framework of the TIMODAZ project laboratory and in-situ experiments have been performed to study the failure processes around tunnels in laminated clay rich sedimentary rocks at reduced scale. The fracture patterns observed in the hollow cylinde ...
Technical difficulties associated with tunnelling operations in tectonized geological settings are frequently encountered. They may include instantaneous and delayed cavity convergence, sudden collapse of walls or roof of a gallery, outpouring of fault-fil ...
This project, supported by the Swiss Federal Roads Authority (OFROU), focuses on the long term behaviour of road tunnels and on their main pathologies. As a tunnel is composed by lining structure and rock mass, it has been necessary to consider the effects ...
A coupled hydro-mechanical formulation is presented for the analysis of landslide motion during crisis episodes. The mathematical formulation is used to model a natural slope affected by a multiple slip surface failure mechanism, in which pore water pressu ...