Êtes-vous un étudiant de l'EPFL à la recherche d'un projet de semestre?
Travaillez avec nous sur des projets en science des données et en visualisation, et déployez votre projet sous forme d'application sur Graph Search.
This paper presents a novel method of hydro power plant operation, based on the control of the injectors’ or wicked gates opening time as a function of the upper reservoir level. In this way, a faster power injection, depending on the current water level on the upper reservoir, could be achieved. When this level is higher, the opening time could be shorter; hence, hydropower ramps could be steeper. Due to this control, frequency excursions and load shedding trips are smaller, thus the power quality is enhanced. This method has been tested and validated by computer simulations in a case study located in El Hierro island, Canary Archipelago (Spain). The simulations made show significant improvements, dependent on upper reservoir water level, in power quality.
David Andrew Barry, Ulrich Lemmin, Seyed Mahmood Hamze Ziabari, Frédéric Charles Soulignac, Mehrshad Foroughan
Varun Sharma, Michael Lehning, Franziska Gerber