Summary
Generation IV reactors (Gen IV) are nuclear reactor design technologies that are envisioned as successors of generation III reactors. The Generation IV International Forum (GIF) - an international organization that coordinates the development of generation IV reactors - specifically selected six reactor technologies as candidates for generation IV reactors. The designs target improved safety, sustainability, efficiency, and cost. The first commercial Gen IV plants are not expected before 2040–2050, although the World Nuclear Association in 2015 suggested that some might enter commercial operation before 2030. No precise definition of a Generation IV reactor exists. However, the term is intended to refer to nuclear reactor technologies that were under development as of approximately 2000, and whose designs were (at least at that time) believed to represent "the future shape of nuclear energy." The six designs selected at that time were: the gas-cooled fast reactor (GFR), the lead-cooled fast reactor (LFR), the molten salt reactor (MSR), the sodium-cooled fast reactor (SFR), the supercritical-water-cooled reactor (SCWR) and the very high-temperature reactor (VHTR). The majority of reactors in operation around the world are considered second generation and third generation reactor systems, as the majority of the first generation systems have been retired. Since 2021, China is the first country to operate a demonstration generation-IV reactor, the HTR-PM, of the pebble-bed type. (Meanwhile, Generation V reactors are purely theoretical and are not yet considered feasible.) The most developed Gen IV reactor design is the sodium fast reactor. It has received the greatest share of funding that supports demonstration facilities. Moir and Teller consider the molten-salt reactor, a less developed technology, as potentially having the greatest inherent safety of the six models. The very-high-temperature reactor designs operate at much higher temperatures than prior generations.
About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.