Learning from Failures: Reflections on the Role of Project Design and Design Management in the Procurement of Non-Standard Buildings
Related publications (36)
Graph Chatbot
Chat with Graph Search
Ask any question about EPFL courses, lectures, exercises, research, news, etc. or try the example questions below.
DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.
Two design studios were successively taught in two schools of architecture: one at the Harvard Graduate School of Design (GSD) and the other at the Swiss Federal Institute of Technology in Lausanne (EPFL) in Lausanne, Switzerland, based on "A Global Morato ...
Taylor & Francis Inc2024
,
In the last decades, soil bioengineering has gained considerable popularity worldwide, especially in hillslope, riverbank, and earth embankment stabilisation works. The use of plants as a building material transfers the plant multifunctionality within engi ...
2021
The lecture, starting from a synoptic analysis of the European situation and Belgian realizations of suspended buildings in the years 1960 - 1980, will mainly deal with the construction history of the Administrative Buildings of the Place Chauderon in Laus ...
2021
, ,
Gait speed is a reliable outcome measure across multiple diagnoses, recognized as the 6th vital sign. The focus of the present study was on assessment of gait speed in long-term real-life settings with the aim to: (1) demonstrate feasibility in large cohor ...
NATURE PORTFOLIO2021
Constraints and regulations related to new buildings are constantly evolving and all these changes, in our ways of thinking and producing, will have an impact on standards. For the policy field, contractual relationships, risk-allocation models and procedu ...
Designers are faced with many options on material and technical solutions during the design phase of the building. Different studies proposing solutions and guidelines are presented in the literature. They help to guide the building project toward low CO2- ...
This paper introduces a computational framework that fosters collaboration between architects, engineers, and contractors by bridging the gap between architectural design, structural analysis, and digital construction. The present research is oriented towa ...
The presence of an artesian aquifer lying under the construction site of a hydro-electrical power plant had not been considered in the design project. The foreseen excavation works could not be carried out due to a high risk of hydraulic heave of the excav ...
Social media studies often collect data retrospectively to analyze public opinion. Social media data may decay over time and such decay may prevent the collection of the complete dataset. As a result, the collected dataset may differ from the complete data ...
The built environment is one of the major contributors of greenhouse gas (GHG) emissions. To tackle climate change, global targets have been set for this sector. Although life-cycle assessment (LCA) methods are typically used to evaluate a building project ...