Publication
In the framework of the new feed-in-tariff system in Switzerland for Small Hydropower Plants (SHP), the aim of the SmallFLEX project, led by HES-SO Valais and performed in collaboration with EPFL, WSL, EAWAG, PVE, and FMV, is to show how SHP can provide winter peak energy and ancillary services, whilst remaining eco-compatible. The pilot and demonstrator site selected is the new small hydropower plant of Gletsch-Oberwald (KWGO) owned by FMV and commissioned end of 2017. This run-of-river power plant is equipped with two six jet Pelton turbine units featuring a maximum power of 7 MW each.
Mario Paolone, Christophe Nicolet, Elena Vagnoni, Martin Seydoux