The LHC operational cycle is comprised of several phases such as the ramp, the squeeze and stable beams. During the ramp and squeeze in particular, it has been ob- served that the behaviour of key LHC beam parameters such as tune, orbit and chromaticity is highly reproducible from fill to fill. To reduce the reliance on the crucial feed- back systems, it was decided to perform fill-to-fill feed- forward corrections. The LHC feed-forward application was developed to ease the introduction of corrections to the operational settings. The LHC Feed-Forward software has been used during LHC commissioning and tune and orbit corrections during ramp and squeeze have been suc- cessfully applied. As a result, the required real-time cor- rections for the above parameters have been reduced to a minimum. In parallel, successful trials have been made to apply feedforward corrections before commissioning with beam which are based on M AD - X simulation scans over the unused setting functions. In this paper we present the evolution of feedforward for the LHC and discuss further improvements of this software.
,
Tatiana Pieloni, Milica Rakic, Bruce Roderik, Guillaume Clément Broggi, Giovanni Iadarola, Félix Simon Carlier