Concept

Tucuruí Dam

Summary
The Tucuruí Dam (Tucuruí means "grasshopper's water", translated from Tupí language; Tucuruí) is a concrete gravity dam on the Tocantins River located on the Tucuruí County in the State of Pará, Brazil. The main purpose of the dam is hydroelectric power production and navigation. It is the first large-scale hydroelectric project in the Brazilian Amazon rainforest. The installed capacity of the 25-unit plant is . Phase I construction began in 1980 and ended in 1984 while Phase II began in 1998 and ended in 2010. The dam was featured in the 1985 film The Emerald Forest. The initial reconnaissance of the Tocantins River was carried out by the U.S. Bureau of Reclamation and USAID in 1964. The Amazon Energy Studies Coordination Committee was formed in 1968 and begin hydroelectric project studies in 1969. Before the committee closed, Eletrobrás commissioned further studies, called the "Tocantins Studies", on the entire Tocantins River Basin. In 1973, Brazilian President Emílio Médici was asked to assign funding for a dam on the Tocantins. Two options were available: the Tucuruí Dam and Santo Antonio Dam (unrelated to the current Santo Antonio Dam project on the Madeira river). In 1973, the Engevix-Ecotec consortium carried out feasibility studies and the Santo Antonio Dam was ruled out in 1974. Later in 1974, the Tucuruí Dam was approved during the President Ernesto Geisel administration. The dam was built primarily as a source of hydroelectricity and second for navigation between the upper and lower Tocantins River. The electricity was and is primarily supplied to industrial interests from the aluminum industry like Brazil's Companhia Vale do Rio Doce. Communities in Northeast Brazil would also benefit as well, such as Belém, São Luiz, Marabá, and later Eastern Amazonia. The World Bank refused to fund the dam and most of the funding was procured by Eletronorte and Brazilian institutions such as Eletrobrás, BNH, Banco do Brasil, Caixa Econômica Federal and FINAME. A smaller portion of funding came from Canadian, European and American institutions.
About this result
This page is automatically generated and may contain information that is not correct, complete, up-to-date, or relevant to your search query. The same applies to every other page on this website. Please make sure to verify the information with EPFL's official sources.
Related courses (2)
CIVIL-411: Dam engineering
Dams are paramount for human development around the world. The course is an introduction to the fascinating domain of dam engineering, from design to construction, for water storage and regulated supp
MATH-105(a): Advanced analysis II
Etudier les concepts fondamentaux d'analyse et le calcul différentiel et intégral des fonctions réelles de plusieurs variables.
Related lectures (32)
Tensions and Resources: Brahmaputra River and Hydroelectric Economy
Delves into the political tensions and environmental consequences of the Brahmaputra River dam project.
Modern Algebraic Geometry
Covers modern algebraic geometry, including algebraic sets, morphisms, and projective algebraic sets.
Constraints and Relative Deformations in 2D
Explains the reduction of 3D problems to 2D using constraints and relative deformations.
Show more
Related publications (32)

Experimental investigations on plunge pool protection measures for Ilarion Dam in Greece

Anton Schleiss, Giovanni De Cesare, Azin Amini, Romain Nathan Hippolyte Merlin Van Mol

Ilarion Dam is a 130 m high earthfill dam at Aliakmon River in northern Greece. The dam was commissioned in 2010. It has two spillway tunnels with ski jumps at the outlets. The two spillways are designed to release a total discharge of 5'500 m3/s during th ...
2022

Long-term behaviour of a dam affected by alkali-silica reaction studied by a multi-scale model

Jean-François Molinari, Emil Gallyamov, Mauro Corrado, Jonathan Fauriel

This paper aims to employ a 2D thermo-mechanical multi-scale ASR model for the analysis of a concrete gravity dam in Western Switzerland. Simulation results are com- pared to the field measurements and observations. Analysis of the results reveals no effect ...
2021

Plunge pool rehabilitation with prismatic concrete elements - case study and physical model of Ilarion dam in Greece

Romain Nathan Hippolyte Merlin Van Mol

The 130 m high Ilarion Dam is built on the Aliakmon River in northern Greece. The dam has two spillways with ski jumps at their ends and a plunge pool to cushion the impact of the jets. This pool has suered signicant scouring during several oods in recent ...
2021
Show more
Related concepts (3)
Pará
Pará is a state of Brazil, located in northern Brazil and traversed by the lower Amazon River. It borders the Brazilian states of Amapá, Maranhão, Tocantins, Mato Grosso, Amazonas and Roraima. To the northwest are the borders of Guyana and Suriname, to the northeast of Pará is the Atlantic Ocean. The capital and largest city is Belém, which is located at the Marajó bay, near the estuary of the Amazon river. The state, which is home to 4.1% of the Brazilian population, is responsible for just 2.2% of the Brazilian GDP.
Dam
A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, aquaculture, and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect or store water which can be evenly distributed between locations.
Hydroelectricity
Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and also more than nuclear power. Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems.