Pierluigi Bruzzone, Boris Stepanov, Bo Liu
The first ITER Main Busbar (MBCN1) and Correction Busbar (CBCN1) conductor samples were manufactured in ASIPP and tested in the SULTAN facility. This paper introduces the sample manufacture, including strand, cabling, jacketing and sample preparation, and ...
Elsevier Science Sa2013