Are you an EPFL student looking for a semester project?
Work with us on data science and visualisation projects, and deploy your project as an app on top of Graph Search.
This study investigates the technical and economic feasibility of replacing throttling valves with smale-scale, oil-free turbomachinery in industrial steam networks. This is done from the perspective of the turbomachine, which has to be integrated into a new or existing process. The considered machines have a power range of P = [0.5, ..., 250 kW] and have been designed using real industrial data from existing processes. Design guidelines are developed, which take into account the thermodynamic process as well as engineering aspects of such a turbomachine. The results suggest that steam conditioning prior to heat exchange could be completed by small expanders to produce mechanical work, reducing exergy destruction and improving site-wide energy efficiency compared to throttling valves. Cost estimates for such machines are presented, which serve as a basis for case-specific investment calculations. The resulting payback times of less than 18 months highlight the economic potential such solutions.
Nicola Marzari, Tommaso Chiarotti, Andrea Ferretti
,