Publication

Short chosen-prefix collisions for MD5 and the creation of a rogue CA certificate

Related publications (33)

Rising from rubble - Leveraging existing construction tools for upcycling concrete waste into slender walls

Katrin Beyer, Corentin Jean Dominique Fivet, Stefana Parascho, Qianqing Wang, Maxence Grangeot

In this paper, we present a new method for upcycling concrete rubble waste into slender walls through the lightweight digital augmentation of mainstream construction machines. By using such method, the environmental impact of concrete construction and demo ...
Springer2024

Mercury Rising: Architecture Beyond Greenwashing

Charlotte Malterre-Barthes

“Hot, hot, hot, hot/ Hot, hot, hot, hot” Yeon Kim / Troelsen Thomas / Sigvardt Mikkel Renee, “Hot Summer,” in Strictly Physical, ed. Monrose (Universal Music Publishing Ab, Emi Music Publishing Denmark A/s, Culture Technology Group Asia, S M Entertainment ...
2023

South Sudan - Building Resources & Shelter Practices

Edisson Xavier Estrella Arcos, André Ullal

Seasonal floods are a common and extended problem across several regions in South Sudan, causing considerable damage to houses, crops, and livelihoods. In this context, new housing and shelter solutions, besides being flood resilient, should take into acco ...
2022

A Collaborative Workflow to Automate the Design, Analysis, and Construction of Integrally-Attached Timber Plate Structures

Yves Weinand, Petras Vestartas, Nicolas Henry Pierre Louis Rogeau, Aryan Rezaei Rad, Pierre Latteur

This paper introduces a computational framework that fosters collaboration between architects, engineers, and contractors by bridging the gap between architectural design, structural analysis, and digital construction. The present research is oriented towa ...
CAADRIA2022

Experimental techniques for suspended structures: the construction of Chauderon hanging building in Lausanne (R. Willomet, P. Dumartheray and J. Prouvé, 1970-1974)

Giuseppe Galbiati

The lecture, starting from a synoptic analysis of the European situation and Belgian realizations of suspended buildings in the years 1960 - 1980, will mainly deal with the construction history of the Administrative Buildings of the Place Chauderon in Laus ...
2021

Tunnel in urban site - Lausanne Metro m3 Section Casernes – Blécherette

Loïc Bonny

The objective of this scientific paper is to present the m3 metro project, in particular the Casernes-Blécherette section. The article is a summary of the final project development based on the technical report [1]. It includes the geological and hydrogeol ...
2021

Notes on learning through building in the Open City: Body, Craft and Materiality

Patricia Guaita, Raffael Baur

The presented research project was carried out through a series of international summer workshops with the vocation of being, at the same time, atelier, construction site, training instrument, and inhabited space. It thus at once presents: an alternative e ...
Park Books2021

Centre National d'Art et de Culture Georges Pompidou: Monument National e Live Centre of Information. Cronache di idea, progetto e fabbricazione, 1968-1977

Boris Hamzeian

The Centre Beaubourg of Paris, now known as the Centre National d'Art et de Culture Georges Pompidou, conceived by Piano+Rogers Architects and Ove Arup & Partners, between 1971 and 1977, represents one of the rare synthesis of the architectural, constructi ...
EPFL2021

Analyse du comportement d’une structure avec application des techniques de la réalité virtuelle

Lucas Ferrari

engineering has remained very traditional. The advances made in the fields of representation and visualisation, and in particular the progress made in virtual reality, lead us to wonder what added value this technology can bring to the world of constructio ...
2021

Hydraulic soil failure due to artesian ground conditions during the construction of a hydro electrical power plant on Sakarya river

Katinka Meier

The presence of an artesian aquifer lying under the construction site of a hydro-electrical power plant had not been considered in the design project. The foreseen excavation works could not be carried out due to a high risk of hydraulic heave of the excav ...
2020

Graph Chatbot

Chat with Graph Search

Ask any question about EPFL courses, lectures, exercises, research, news, etc. or try the example questions below.

DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.